Olympic Village profile
Adjust font size:

Profile

The Olympic Village lies in the northwest corner of the Beijing Olympic Green, with the Olympic competition venues to its south and the Forest Park to its north.

The Village, with an area of 66 hectares, includes the Apartment Buildings for athletes in the south and the overlay area in the north.

During the Olympic Games, the Olympic Village can accommodate more than 16,000 athletes and officials (7,000 athletes and officials during the Paralympic Games) and provide services related to accommodation, living, training, leisure, entertainment, etc.

The Residential Zone

The Residential Zone has an area of 27.55 hectares and a floor area of 524,000 square meters. They include 20 9-storey buildings, 22 6-storey buildings, 3 Super Resident Centres, 9 Resident Centres and facilities, such as the Polyclinic and the Casual Dining Hall. Overlay area in the north

The overlay area in the north of the village will provide services including arrival, accreditation, leisure, catering, fitness, departure, etc. for athletes coming to the Olympic and Paralympic Games.

There will be the Welcome Ceremony Stage, the Village Mayor Office, the Dining Hall, the shopping centre, the logistics centre, the accreditation centre, etc.

Construction

The Structural Engineering: outer facade is fitted up and the indoor fine decoration has been completely largely.

Water supply and drainage system: the pipes to supply water for daily life, potable water, reclaimed water for flushing toilets, hot water for shower, and water for fire fighting have been installed. Sewers have been installed.

The electrical equipment: outdoor power system, switching station, electricity distribution room, room lighting and indoor panel box systems have been installed. And the full loading operation has been carried out. The elevator has been installed. The construction of the intelligent systems (building automation, fire control, office, security, communication, automatic control) has entered the final stage.

Air conditioning and heating: the first phase commissioning of air conditioning was completed in September 2007. The heating for winter is underway.

Landscape project: the engineering for road surface course, outdoor lighting, green space and water system, enclosure and gate is close to the end. Main building and outdoor engineering have been completed largely The public space, such as staircases and elevator halls, has been fitted up The indoor fine decoration has been completed largely Water supply and drainage system and sanitary wares have been installed. The elevations have been installed

Air conditioning system with water reclamation heat pumps has been put into operation.

Follow-up

Before Lockdown (begins on July 8th, 2008): The full loading test is scheduled to be carried out according to the actual need during the Games-time. During the test, the shower water, potable water, tap water, drainage, outdoor and indoor lighting, elevator, intelligentization and other systems will be tested; the water reclamation heat pump system will be put into operation for cooling purpose with automatic control; the BOCOG operation team will move in; FF&E and other facilities will be loaded in.

The opening and closing of the Village: The Olympic Village will open on July 27, 2008 and close on August 28, 2008. The Paralympic Village will open on August 30 and close on September 20.

Application of the three concepts of the Olympic Games

The following green technologies have been applied: renewable energy, water reclamation, utilization of rain and flood, green building materials, energy-saving building, green indoor environment, ecological landscape, intelligent house, DTV, and green lighting, accessible facilities. The harmony between culture, architecture and environment has been achieved in the green residential area. The village, with its world leading technology, has showcased to the world the distinguishing characteristics of the high level Olympic Games.

The whole process of the construction illustrates the “three concepts”. For example, slag was used to pave the lanes at the construction sites; solar energy adopted for lighting; water sprayed to remove dust; water permeation bricks paved.

Utilization of renewable energy

Renewable energy utilized to save energy and cut emission During the Games-times, 7,890,000 kilowatt hours will be obtained from solar energy and reclaimed water for services.

After the Olympic Games, 67 million kilowatt hours will be obtained from solar energy and reclaimed water.

The reclaimed water heat pump air conditioning system

The system draws energy through heat exchange from the reclaimed water from the Qinghe Wastewater Treatment Plant and discharges the water to the rivers. During the process, the water quality will not change and water will not lessen while the energy in the reclaimed water can be utilized. The energy drawn from the reclaimed water can be enhanced by the heat pumps for heating and cooling. The system consumes electricity 40% less than the ordinary air conditioners. Thanks to the world leading wastewater utilization system, cooling towers or outdoor machines are not needed, no noise or smoke will be generated, and the heat island effect can be removed completely.

Integrated solar energy water heating system

The solar energy heating pipes are installed horizontally in the gardens on the roofs, constituting part of the pergola and thus integrated into the garden. 6,000 square metres solar energy water heating system can provide bathing hot water for more than 16,000 athletes. After the Olympic Games, it can provide hot water for nearly 2,000 households nearby.

All the details of the solar energy water heating system have been taken into consideration. They include heat collection, heat exchange, heat preservation, sterilization, heat source backup, waste heat utilization, automatic control, etc. The indirect cycle heat exchange is adopted in the system, featuring independent operation, consistent water temperature, easy maintenance and easy calculation. The solar energy water heating system can save 5 million kilowatt hours electric power per year. The scale and cutting edge technology have excelled those of the previous Olympic Games.

The solar collectors have been installed Street lamps with Solar/Wind Hybrid Power

Solar energy street lamps, garden lamps, lawn lamps, light pipes, green lighting such as LED lighting have been used to make the Olympic nights even more colorful.

Micro energy consumption building (Super Resident Center)

More than 20 cutting edge technologies, such as solar heat collection, solar water heating, solar dehumidification, cogeneration of heat and power by solar energy, windmill power generation, air conditioning by geo thermal heat pumps, vacuum windowpane, intellectual control, etc. have been applied in the micro energy consumption buildings. For 2,000 square metres of the micro energy consumption buildings, each square metre will consume 36 kilowatt hours annually, which is 1/3rd of the consumption of the existing energy saving buildings. 147,000 kilowatt hours of energy can be saved yearly.

Energy-saving buildings

Outer building enclosure heat preservation system

Thickened XPS extruded sheets have been used for walls and building surfaces, with heat transfer coefficient at 0.38w/ ㎡ .k. It can save energy while preserving heat. The heat insulation can make the buildings cool in summer and warm in winter.

Double-glazing LOW-E windowpanes

The double-glazing LOW-E glass with inert gases fill framed by aluminum has been used. The glass features thermal insulation and noise prevention. The K value (heat transfer coefficient) is close to 2.0. It can reduce the noise by 40db. The coating is of low radiant ratio. Such super thing low radiation coating can reflect most of the heat back to the room to prevent heat loss in winter. It can block the outdoor sun radiation in summer. The gas fill can cut the sound transmission to reduce noise while presenting good view.

Energy-saving Persian blinds

The heat transfer coefficient of the sealed insulating glass adopted for the Persian blinds is lower than ordinary ones. Therefore, it can save energy significantly. The blinds will be put into the cavity between the two layers of glass. The blinds can block solar radiation when closed to cut the energy consumption by the air conditioners. The blinds can absorb solar heat to keep the inside warm when opened. The magnetic system sealed within can control the movement of the slats. Thus, the solar radiation can be blocked while the view can be presented.

Environmental Protection

Biological sewage treatment technology used in landscape flowers house Biological sewage treatment technology is adopted in the Olympic Village to treat part of domestic waste water and also to provide water for landscape. Simulating the self-purification capacity of water, a water body biological balance system applying food chains of animals and plants is set up to treat the domestic water in a comprehensive way. In this way 200 tons of water can be provided to water the landscape.

Diagram of rain and flood water utilization

6000 m3of water can be collected and reused every year to water the green space and clean the road.

Application of environmental-friendly materials

In order to ensure a good indoor environment, construction materials(including cement, concrete, mixture, water reducing agent, wall materials, glass and glass wares, sanitary ceramics, doors and windows, water-proof materials) and decoration materials(artificial boards and products, coatings and paints, adhesives ) have been tested and undergone pre-control process during the construction. The environmental protection indicators of all these materials surpass the national standard E1, and reach E0 standard required by the Environmental Protection Guide of Olympic Projects.

High standard environmental-friendly paint

Quality Titanium dioxide white paint and wall paint with innovative environmental protection technology used in the Olympic Village are stain resistant and durable. The paint does not include heavy metals, content of the VOC(volatile organic compounds) and formaldehyde is close to zero.

Human oriented design ?Accessible design system Outdoors—Accessible ramps and blind sidewalks are set. The entrance and exit of apartments are level with the outside roads. Outdoor roads are higher than green space. Overhead wood plastic board is used to connect entrance and exit of a building with the outside roads, thus protecting the green space and facilitate people with walking difficulties. Public space—Accessible ramps and hand rails are installed at the main entrance of apartments and public facilities. Lifts tailor made for people with a disability are 900mm wide and accommodative for wheelchairs. Horizontal operating panels are provided in the lifts. Indoors—Accessible facilities are installed indoors. An accessible toilet is installed in each apartment on the ground, first and second floor, where sanitary wares and equipments up to the accessible design are used.

?High standard potable water system The deeply purified potable water (neutral Ph) tastes cool. Water goes through O3, activated carbon, ultrafiltration, nanofiltration, finished water storage tank, Catalyze Oxidation Sterilization, activated carbon, frequency conversion and pressure before reaching the users. Water is supplied around the clock thus avoiding the second time pollution in the pipelines. So high quality potable water is provided in the Olympic Village.

Excerpts from the BEIJING 2008 OLYMPIC GAMES - AN ENVIRONMENTAL REVIEW by UNEP: The venue features innovative technologies, such as a heat pump system, photovoltaic panels, beam-pipe illumination, solar collectors, water saving devices, and rainwater collection. The designers have succeeding in designing a people-oriented, healthy, comfortable and energy-saving environment in the Village.

(China.org.cn March 5, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
Most Viewed >>
- A deal or a steal?
- White paper published on China's rule of law
- Nation vows full protection of IPR
- Presidium, agenda set for parliamentary session
- Illegal mining firms focus of campaign

Product Directory
China Search
Country Search
Hot Buys
国内精品一区二区三区最新_不卡一区二区在线_另类重口100页在线播放_精品中文字幕一区在线
久久国产精品99精品国产 | 成人性生交大合| 另类小说综合欧美亚洲| 日本少妇一区二区| 久久精品噜噜噜成人88aⅴ| 久色婷婷小香蕉久久| 国产精品18久久久久久久久久久久| 精品亚洲porn| jlzzjlzz欧美大全| 在线免费观看日本欧美| 欧美高清视频在线高清观看mv色露露十八| 欧美日韩国产成人在线免费| 日韩一区二区三区电影| 久久综合色婷婷| 亚洲色大成网站www久久九九| 亚洲曰韩产成在线| 久久99精品久久久久婷婷| 高清成人免费视频| 欧美午夜精品电影| 2023国产精品| 亚洲一区二区欧美| 国产一区二区0| 在线亚洲免费视频| 精品黑人一区二区三区久久| 中文字幕亚洲欧美在线不卡| 婷婷一区二区三区| 成人av电影在线| 欧美一区二区免费观在线| 国产精品毛片无遮挡高清| 亚洲成va人在线观看| 丰满少妇久久久久久久| 欧美日韩亚洲综合一区| 中文字幕免费在线观看视频一区| 亚洲国产欧美在线| 99视频超级精品| 日韩精品专区在线| 亚洲一区二区美女| av在线不卡电影| 久久久久久久久一| 日韩电影在线观看电影| 色视频成人在线观看免| 国产亚洲欧美中文| 久久精品国产999大香线蕉| 色综合视频一区二区三区高清| 精品久久人人做人人爰| 亚洲成人午夜电影| 99在线视频精品| 国产亚洲综合av| 老司机午夜精品| 欧美日韩大陆在线| 亚洲一区影音先锋| 色播五月激情综合网| 国产精品女主播av| 粉嫩嫩av羞羞动漫久久久| 日韩欧美成人一区| 奇米影视7777精品一区二区| 欧美色国产精品| 一区二区欧美视频| 91啪亚洲精品| 亚洲特级片在线| 99久久伊人网影院| 国产精品久久久久四虎| 丁香婷婷综合激情五月色| 久久女同互慰一区二区三区| 狠狠网亚洲精品| 久久久久久久久久看片| 国产毛片精品国产一区二区三区| www精品美女久久久tv| 国产乱码精品一品二品| 国产亚洲短视频| 成人免费视频视频在线观看免费| 欧美高清在线一区| 99国产麻豆精品| 亚洲一区精品在线| 91精品国产综合久久香蕉的特点| 免费在线观看不卡| 久久免费看少妇高潮| 成人中文字幕合集| 一区二区在线电影| 欧美理论电影在线| 韩国av一区二区三区在线观看| 久久日韩粉嫩一区二区三区| 成人免费毛片aaaaa**| 亚洲理论在线观看| 7777精品伊人久久久大香线蕉完整版 | 狠狠色综合播放一区二区| 国产日韩亚洲欧美综合| 99精品视频中文字幕| 亚洲一区二区精品视频| 日韩免费高清电影| 成人h动漫精品| 午夜电影网一区| 久久久久久久国产精品影院| 91麻豆精品在线观看| 日韩福利视频网| 欧美国产精品专区| 欧美久久久久久久久久| 国产一区二区看久久| 亚洲免费av观看| 日韩欧美你懂的| 97精品超碰一区二区三区| 天堂成人国产精品一区| 国产拍欧美日韩视频二区| 色老头久久综合| 国产精品一品二品| 肉色丝袜一区二区| 国产精品久久看| 日韩一区二区免费在线观看| 99视频有精品| 国产精品香蕉一区二区三区| 亚洲mv在线观看| 欧美激情综合五月色丁香| 欧美日韩一区二区三区不卡| 成人性视频免费网站| 丝袜亚洲另类欧美| 亚洲免费伊人电影| 国产日韩av一区二区| 欧美男生操女生| 一本一道久久a久久精品| 国产主播一区二区| 日本不卡视频在线| 亚洲午夜私人影院| 亚洲欧美一区二区在线观看| 精品88久久久久88久久久| 欧美日韩色一区| 91久久奴性调教| 99精品欧美一区二区三区综合在线| 狠狠色综合日日| 麻豆一区二区三| 日本美女一区二区三区| 亚洲国产欧美日韩另类综合| 国产精品日韩精品欧美在线| 久久久影院官网| 久久先锋影音av| 久久久一区二区三区捆绑**| 精品国产一区二区三区av性色 | 亚洲妇女屁股眼交7| 中文字幕一区二区视频| 国产精品欧美一级免费| 国产精品全国免费观看高清| 久久精品夜夜夜夜久久| 久久精品视频在线看| 国产偷国产偷精品高清尤物 | 男女激情视频一区| 日韩福利视频导航| 毛片av中文字幕一区二区| 蜜桃在线一区二区三区| 免费人成精品欧美精品| 美女免费视频一区二区| 精品一区二区国语对白| 国模少妇一区二区三区| 国产美女精品人人做人人爽 | 91美女片黄在线观看91美女| 99久久免费视频.com| 色综合久久久久综合99| 欧美丝袜丝交足nylons图片| 欧美精品一卡二卡| 欧美一区二区三区在| 亚洲精品在线三区| 国产精品久久久久久亚洲毛片| 国产精品福利在线播放| 亚洲精品福利视频网站| 亚洲综合免费观看高清完整版在线 | 成人精品免费视频| 色婷婷激情综合| 欧美高清视频在线高清观看mv色露露十八 | 91麻豆123| 欧美一区二区三区小说| 久久久精品蜜桃| 亚洲欧美欧美一区二区三区| 午夜精品久久久久久不卡8050| 日本亚洲免费观看| 国产黄人亚洲片| 91精品福利视频| 日韩三级电影网址| 中文字幕在线观看一区二区| 亚洲成人黄色影院| 国产精品1024久久| 欧美亚洲禁片免费| 久久精品一区二区三区四区| 伊人性伊人情综合网| 国产裸体歌舞团一区二区| 欧美在线短视频| 国产视频在线观看一区二区三区| 亚洲一区二区三区四区不卡 | 亚洲品质自拍视频| 久久精品国产亚洲5555| 91精彩视频在线观看| 久久久久免费观看| 日韩电影免费一区| 99在线热播精品免费| 久久久久久免费毛片精品| 亚洲一区精品在线| av一区二区三区黑人| 日韩欧美国产不卡| 日韩中文字幕一区二区三区| zzijzzij亚洲日本少妇熟睡| 日韩精品自拍偷拍| 午夜视频在线观看一区二区三区| av成人老司机|